The best time to plan your interiors is before the walls are plastered. We plan them together with your house, and our interior wing, Nila Interiors, designs and fits them.

Why Plan Interiors While the House Is Being Built?

Most interior problems are not design problems. They happen because the house was built before anyone decided where the furniture would go.

If you decide lateWhat happensDecided early
Wardrobe positionsSwitch boards end up behind the wardrobe doors.Switches are placed beside the wardrobe, where you can reach them.
AC positionsPipes run outside the wall, or the wall is cut open later.Pipe sleeves are fixed in the wall before plastering.
False ceilingThe room feels low, and the fan hangs too close to your head.The ceiling height leaves room for a false ceiling and a fan.
Kitchen layoutThe sink, gas and chimney points don't match the kitchen design.Water, gas and power points are placed for the kitchen you want.
TV wallWires hang below the TV or run in plastic channels.A hidden pipe runs inside the wall for the cables.
Bathroom fittingsThe shower, mirror and shelves don't line up with the tiles.Fittings and niches are marked before tiling.

What to Decide at Each Stage of Construction

You don't have to choose every colour on day one. You only need to make the right decision before each stage closes the door on it.

  1. While the house is being designed

    Furniture and kitchen layout

    Where the beds, wardrobes, sofa, dining table and kitchen counters will go. Everything else follows from this.

  2. Before the roof slab

    Ceiling heights and ceiling light points

    Decide where you want a false ceiling, so the slab height and the light points inside it suit it.

  3. Before plastering

    Switches, sockets, AC and TV pipes, kitchen plumbing

    The most important stage. Once the walls are plastered, every change means cutting and patching.

  4. Before flooring and tiling

    Bathroom fittings and built-in niches

    Mark shower, mirror and shelf positions, and any floor level changes for wardrobes or kitchen counters.

  5. Before the last coat of paint

    Wardrobes, kitchen and ceiling work

    Fit the woodwork and ceilings first, then paint last, so the final coat isn't scratched by carpentry.

Two teams, one plan

Who Does What: Nila Group of Builders and Nila Interiors

Nila Interiors is the interior design wing of Nila Group of Builders, in the same building at Mangad. We plan together, so the building work is ready for the interiors.

Nila Group of Builders

Builds the house ready for interiors

  • Furniture layout in the house design
  • Ceiling heights for false ceilings
  • Switch, socket and light positions
  • AC pipe sleeves and TV cable pipes
  • Kitchen and bathroom plumbing points
  • Flooring, tiling and wall finishes

Nila Interiors

Designs and fits the interiors

  • Interior design and 3D views of rooms
  • Modular kitchen
  • Wardrobes and storage
  • False ceiling and lighting design
  • Furniture, TV units and wall panels
  • Curtains, wallpaper and decor
See Nila Interiors’ interior design in Kollam ›

Already living in your house and only need interiors? Go straight to Nila Interiors, our interior design team in Kollam.

Why Plan Your House and Interiors With One Group

One drawing set

The house plan and the interior plan are made from the same drawings, so the wardrobe fits the wall it was drawn for.

No blame between contractors

If a socket is in the wrong place, there's one group to fix it, not two contractors pointing at each other.

Budget seen in full

You see the building cost and the interior cost together early, so the interiors aren't squeezed at the end.

Designing a new house first? Our architects in Kollam plan the furniture layout as part of the design, and our house construction team builds it ready for the interiors.

Questions About Planning Interiors

When should I bring in the interior designer?

While the house is still being designed, or at the latest before plastering. That's when switch, plumbing and ceiling positions can still be changed for free.

Do I have to finish all the interiors when I move in?

No. Many families do the kitchen and wardrobes first and the rest later. Plan all the points now, so adding the rest later doesn't mean breaking walls.

Does planning interiors early cost more?

No. Placing a switch or a pipe in the right spot costs the same as placing it in the wrong one. Moving it after plastering is what costs extra.

My house is already built. Can I still get interiors done?

Yes. Nila Interiors does interiors for finished homes too. They'll check your existing switch and plumbing points and design around them.